If these sections could be built early next spring or summer, the work would probably be better done. After opening the windows in the present tomb a large part of the moisture disappeared, there was still however considerable left. After the tomb had been ventilated in this way for several weeks, I visited it in both dry & wet weather. In the dry weather a considerable improvement was seen, but in wet weather there was a large amount of water dripping from the arch, particularly in the vestibule.

If only the catacombs could be built during the present year, the tomb could be used, & with no metal door or tiling, ought nor [sic - not] to be a very expensive matter

Respectfully

J. W. Lovering

Last edit 11 months ago by gbenoit
CB04_0007
Indexed

CB04_0007

7

H. B. Mackintosh Esq

Treas'r

Dr Sir

I sent you an estimation amount of materials on hand 4.

Loam $290
Manure 387
Brick & Cement 50.
Slates 700.
Granite Block Stone 120.
Granite Posts 625.
Iron & Lead 85
[Total] $2257.00
I consider this a very moderate estimate

Yrs truly

J. W. Lovering Supt

Last edit 11 months ago by gbenoit
CB04_0008
Indexed

CB04_0008

8

H.B. Mackintosh Treas.

With this please find the following Bills viz:

1 T. C. White (3 bills) 297.20
2 Francis L. Chapman 5.10
3 James Brown 50.18
4 Robert L B Fox 3.50
5 C. W. Gardner 9.45
6 D U Chamberlin 41.13
7 William Blake & Co 13.56
8 Knox & Angier 19.95
9 Gale & Wood 1 50
10 James Bolger 3.75
11 G H Moseley & Co 381.68
12 E. H. Luke & Son 67.37
13 Chas Moore & Co 38.97
14 J. Richardson & Brothers 14.28
15 J. G. & N. G. Gooch 35.17
[subtotal] $982.79
16 C McArthur 142.80
[Total] $1125.59
Yours Truly

James W Lovering

per Childs

Last edit 2 months ago by gbenoit
CB04_0009
Indexed

CB04_0009

9

Saml Batchelder Jr.

Sec'y.

D Sir

I send you a report on #3021 and 2. of Sherburne.

I told Mr Snow that the lots measured to the inside of posts the correct quantity (not having the plan). I find now when I come to divide the quantities between the lots that I am mistaken, and that if the inside corners of the posts are fixed as boundaries, 23 ft more are needed to make up the required amount, which I have added as the blue line on plan will show, as I can see no objection to it and I know it to be acceptable to Mr Sherburne .

Yours truly

J. W. Lovering

Supt.

Last edit 11 months ago by gbenoit
CB04_0010
Indexed

CB04_0010

10

Diagram of Lots 3021 and 3022 Petunia Path (left) and Oak Ave (right)

[Written vertically at the left] 3021 and 3022 Relocated

[Below lot diagram]

Old arrangement New
#3021 ~ 380 485
3022 380 275
[total] 760 760
Last edit 11 months ago by gbenoit