Painting
All outside wood, iron, and tin work
to have two coats of mineral paint
and linseed oil. Door and windows
to be painted inside and out.

Iron anchor to be put on each end of
every fifth row of joist. An anchor extreme
end of each girder.

Forges and flues to be built of brick,
as per plan. Build in iron [unclear] blower
and four inch cast iron rim with
flange [chok], protecting forge. Continue
flues through roof and top out as
per plan.

Finally, the material ust be the best
of their several kinds and work must
be executed in the most substantial
workmanlike manner, and finished
complete according to the true intent
and meaning of plans and specification.