page_0008

OverviewTranscribeVersionsHelp

Facsimile

Transcription

Status: Incomplete

with hooks, staples, and locks as
may be required. Doors all to be
screwed together with 1 3/4 inch screws.
Hinges all bolted on doors.

Stairs
All outside stairs to be of iron
[barriages?] to be built of 1/2 x 3in iron
bars. Iron brackets supporting
platform post and railing iron.
Steps and platform to be of wood.

Tin Roofs
Put on all tin roofs with best quality
of [O. G.] lead plate roofing tin, to be
put on double lock standing seam,
to receive one coat of mineral paint,
and linseed oil on both sides.

Stone Work
All gables to be coped with stone
6in thick by 16 inches wide, [unclear] stone
to all corners, receiving cornice as per plan.
All of much must be cut of a good
sand stone. Door sills to be cut of hard
stone and properly set.

Notes and Questions

Please sign in to write a note for this page

vgspencer

I think the G. in O.G. stands for galvanized, which is a type of lead plate roofing tin. No idea about the O