Here you can see all page revisions and compare the changes have been made in each revision. Left column shows the page title and transcription in the selected revision, right column shows what have been changed. Unchanged text is highlighted in white, deleted text is highlighted in red, and inserted text is highlighted in green color.

2 revisions
kishman at Jan 11, 2021 03:13 PM

798 [=159] (V.2)

798

in width on the remaining miles
of its length, the side of slopes being
at an angle of 45°.

The cost of this excavation
was Cos Rs 34807..6..8 at a rate
for 1000 cubic feet equal to 1..9..6.8

The headwork is constructed
of Kunkur and brick masonry,
the disposition of the material
being the same as that univer-
-sally adopted ^[in this div? of the works] where Kunkur is
procurable. Kunkur being used
in the floorings and most mas-
-sive parts and brick elsewhere.

The proportions of material
used in cement are as follows:

2 parts of earth lime
1 part of Soorkee

The quantity of material expend-
-ed [in the work, struck through] and the rates
at which the different species
of work [was, struck through] were executed will be
seen by the following table.

[table follows:]
Rates of work
Masonry Rs 12..6..6 for 100 cubic feet
Plaster 3..0'..3 per 100 superficial feet

Materials expended
425640 bricks of various sizes
18918 cubic feet earth lime
9459 ___ do ___ Soorkee
[table ends]

Mahomed Aboo's Escape was begun
and completed by Mr. Read the
Executive Officer of the 2nd Division
of the works. Its cost was, ex-
-cluding the cost of regulating
apparatus Cos Rs 10487..11..7

No. 3 [Tanni?] Khoord Escape

This as the third of the
series of escapes attached to the
upper

798 [=159] (V.2)