Here you can see all page revisions and compare the changes have been made in each revision. Left column shows the page title and transcription in the selected revision, right column shows what have been changed. Unchanged text is highlighted in white, deleted text is highlighted in red, and inserted text is highlighted in green color.

2 revisions
Wjhoward at Mar 07, 2017 11:05 PM

6

544 – Cape Foulweather
The keepers commenced work in the new drain for the vaults by digging the trench and placing in it a temporary open wood drain.
546 – Point Adams
An examination was made of the LH Reservation and vicinity with a view to the prevention of sand drift, and plans prepared to effect this by means of vegetation and plantations. A report and estimate was sent to the Board Aug 5th 1884.
567 – Shoalwater Bay
An examination similar to that at Point Adams, was made with reference to the prevention of sand drift. The keepers cleared the sand off the plank road from the barn to the lighthouse