Canal. From the 150th mile to
the Terminus ; the Heads are con
=tinued on the 6 feet width, but
their sills are laid on the
level of the bed of the
Channel.-

The outlets or Escapes have
been fixed as nearly as possible
about 40 miles apart, and at
similar distances to those on the
Caunpoor Branch; their sites
are at Gi[...]or, Mulhosi and
Sithmuna:_ the Escape which
is connected with the Terminal
works being considered as a por=
tion ofthe works attached to
the Lockage, and not coming
under the classification of a
separate building. _

The views which I have
entertained with regard to the
postponement ofthe works on
the Futtigush, Bolundshuhur
and Koel Branches, and to which
I have drawn attention in a former
chapter; have inclined me to
place the Terminal works of
the Etawah line in abeyance;
atleast to postpone their exe=
=cution until the supply of
water at the extremities of
these long lines is more accu=
rately understood and determined;
this postponement may in fact
resolve itself simply into a prose=
=cution ofthe works when the
progress of operations arrive at
that particular point, or to a
delay of 2 or 3 years; but with
the example before us of the
Terminal