3
by the Union St Sewer will be [nol-?]
[lesr?] than 100 acres. I would therefore
recommend the construction of an
egg shaped cement sewer from the
centre of 8th St to at least the centre
of 3rd St, with the carrying capacity
of an 18 inch circular sewer
The [coroporative?] cast of the box drain
and the sewer recommended would be about as follows:
Box drain:
20.000 ft Lumber B.M. at $20 per M laid.
$400
Repairs to and cleaning Pike St Sewer
$100
Box Drain
$500.00
Sewer
1610 lineal feet at $2.00 per foot complete
or if carried to 2d st
$3220.00
1932 lineal feet at $2.00 per foot complete
$3864.00
Respectfully,
R. H. [Thornson? Thompson?]