2

OverviewTranscribeVersionsHelp

Facsimile

Transcription

Status: Indexed

71
Columbia June 8th 1894
The town council met at the Town Hall
pursuant to adjournment
Mayor C P Hutchinson presiding
Roll Call and the following councilmen
present- McKay, Willacy, and Groat
The minutes of the last meeting read
and on motion approved.
The committee appointed to see Mr. Camp
about replacing the planks on Rainier Ave
report and on motion the report accepted
and the committee is charged.
Motion made and caried that Clerk notify
Mr. Camp in writing that unless the
planks referred to above are not replaces
within four days the will be replaced
by the town and the cost charged to
the Rainier Ave Electric Ry.
The reports of the following officers read and
on motion accepted and places on file
Engineer report for months of Nov & Dec
on work done on Angeline St by Contractors:-
Bill from John Mullins for lumber $8.34
Bill from Joseph Hellenthal for work $1.54 less
60 ft 1 in pipe 90cents 66 cents net.
Bill from Z C Miles Co for pipe and fitting
$79.08
Bill from S C Woodman for Engineering
work on Angeline St $22.75
Bill from J C Heuff for work done on
Angeline St grade $6.00
Also warrants ordered drawn to pay the
following Bills read and accepted Nov 6th
Joseph Hellenthal $12.19
A Hughston .38
A Larson 4.43
S Pierson 3.25
Frank Walls 7.25
E F Wood .75
R Palmer .50
H Bemiss 2.75
J C Huff 2.50
Hughes, Hastings & Stedman 45.00

Notes and Questions

Nobody has written a note for this page yet

Please sign in to write a note for this page