Here you can see all page revisions and compare the changes have been made in each revision. Left column shows the page title and transcription in the selected revision, right column shows what have been changed. Unchanged text is highlighted in white, deleted text is highlighted in red, and inserted text is highlighted in green color.
6 revisions | EricRoscoe at Apr 27, 2021 11:18 PM p. 1[Printed Broadside]
OHIO CANAL
South of Deer-creek
Notice to Bidders
[Column One]
Each proposition must state distinctly-
For Grubbing and Clearing-A price
per chain measuring lengthwise of the sec-
tion. The price per chain, bid will be un-
derstood to include the whole breadth to
be grubbed and cleared, which varies ac-
cording to the slope of the ground, and the
depth of cutting. No extra allowance will
be made, unless the line be so altered as to
increase the grubbing and clearing.
For Earth Excavation-A price per cub-
ic yard. the price bid, will be under-
stood to include all the various kinds
of earth which may occur.
For the Excavation of Solid Rock-A
price per cubic yard.
For the Excavation or removal of detach-
ed pieces of Rock-A price per cubic yard.
Those only will be estimated under this i-
tem, which contain over one cubic foot
each; all smaller rocks or stones will be es-
timated and paid for as earth excavation.
For Embankment-A price per cubic
yard, to be measured in the bank after it
is finished, and has become sufficiently solid
and compact.
When job is to be accepted soon after
its embankments are completed, the Engi-
neer will require the height and substance
of the banks to be increased to such extent
as he may deem necessary to secure a bank
of proper height and substance after it shall
have become settled. In all cases embank-
ment will be laid out with such base and
height as the Engineer or Acting Commis-
sioner may consider necessary to the safety
and permanency of the work; and will be
estimated to the contractor accordingly,
making allowance for shrinkage.
Embankments must be formed
[Printed Broadside] OHIO CANAL [Column One] For Earth Excavation-A price per cub- For the Excavation of Solid Rock-A For the Excavation or removal of detach- For Embankment-A price per cubic When job is to be accepted soon after Embankments must be formed p. 1[Printed Broadside]
OHIO CANAL
South of Deer-creek
Notice to Bidders
[Column One]
Each proposition must state distinctly-
For Grubbing and Clearing-A price
per chain measuring lengthwise of the sec-
tion. The price per chain, bid will be un-
derstood to include the whole breadth to
be grubbed and cleared, which varies ac-
cording to the slope of the ground, and the
depth of cutting. No extra allowance will
be made, unless the line be so altered as to
increase the grubbing and clearing.
For Earth Excavation-A price per cub-
ic yard. the price bid, will be under-
stood to include all the various kinds
of earth which may occur.
For the Excavation of Solid Rock-A
price per cubic yard.
For the Excavation or rremoval of detach-
ed pieces of Rock-A price per cubic yard.
Those only will be estimated under this i-
tem, which contain over one cubic foot
each; all smaller rocks or stones will be es-
timated and paid for as earth excavation.
For Embankment-A price per cubic
yard, to be measured in the bank after it
is finished, and has become sufficiently solid
and compact.
When job is to be accepted soon after
its embankments are completed, the Engi-
neer will require the height and substance
of the banks to be increased to such extent
as he may deem necessary to secure a bank
of proper height and substance after it shall
have become settled. In all cases embank-
ment will belaid out with such base and
height as the Engineer or Acting Commis-
sioner may consider necessary to the safety
and permancency of the work; and will be
estimated to the contractor accordingly,
making allowance for shrinkage.
Embankments must be formed [Printed Broadside] OHIO CANAL [Column One] For Earth Excavation-A price per cub- For the Excavation of Solid Rock-A For the Excavation or rremoval of detach- For Embankment-A price per cubic When job is to be accepted soon after Embankments must be formed |