CB04_0011

OverviewTranscribeVersionsHelp

Facsimile

Transcription

Status: Indexed

11

[187]4

S. D. Massey Esq

Dear Sir

In you left an order here to have your lot graded
sodded, posted & no[t] cut; also to have a small foundation built.
This work I understand you thought was not to be done for several weeks
tho I find no mention of this on the books.

This work was done the charges being


36 loads loam $36.00
4 " [loads] manure 13.50
780 sods 31.20
10 dys labor 25.00
4 10" posts 16.00
Foundations 7.83
[Subtotal] $129.03
This bill was not rendered until after the lot was curbed , tho'
the work was done first and therefore the posts were taken back -16.00
[Total] $113.03

In you contracted Hugh Rowe to curb & complete the lot
but you gave no notice of your change of plan to the corporation & we
had no reason to believe your order was not in full force.

Rowe bill was


(1) removing stone & setting sod $78
3 tons foundation 12.
81 lbs lead 9.67
21 clamps 5.25
5½ dys grading 13.75
15 loads gravel 7.50
2 " [loads] manure 6.00
4 days sodding 10.00
1¾ " [days] leading 6.12
[Total] $148.29


Of this bill the cost of
setting curb was 108.04
Taking off & replacing sod 29.75
Filling with gravel 10.50
[Total] $148.29

Please notice that Rowe pays for no sods, or loam & but a small
amount of manure. Therefore at any rate the loam $36 and sods $3120
should be paid for.

Notes and Questions

Nobody has written a note for this page yet

Please sign in to write a note for this page