CB03_0423
Facsimile
Transcription
Status: Indexed
[right]
H.B. Mackintosh Esq
Dear Sir
The items of the charge
against Lot #4288 Holman Prop. are
as follows.
Building Foundation | 7.00 |
---|---|
4 8in Octagonal Posts | 16.00 |
462 Ft sods | 16.17 |
18 Loads Loam | 19.80 |
1 [load] Manure | 3.25 |
6 days Labor Grading | 15.75 |
Cutting Lumber | 3.00 |
[Total] | $80.97 |
after the first sodding was put on.
Very Respectfully
JW Lovering Supt. per Childs
423
Notes and Questions
Please sign in to write a note for this page