171
Facsimile
Transcription
Status: Needs Review
2215 13 Mar 68
Found JMS's weren't
working from III DP to AMPEX Core 1
found FB01 in III wasn't getting
through to MA.
Re-cut random wire at III
1K10R - 1K10S
Added Klugg wire 1K10R - 1J2L
down at 2030.. Time to fix
1 hr 45 min.
SRR
2200 14 Mar. 68
New 4-channel D-A output
amplifiers installed (see drwgs. in
kluge bay binder). N.B. that power on the plenum door of
supply no. 2
Bay 2 is now set to +15 V. and -7 V.
See me before changing!
Also, four filters are now in boxes
on top of Bay 2. Each box (channels A and B)
has two filters, switch selectable.
D.M.P
Notes and Questions
Nobody has written a note for this page yet
Please sign in to write a note for this page