Page 169

OverviewTranscribeVersionsHelp

Facsimile

Transcription

Status: Needs Review

134
satisfaction of Frank. L. Packard, or his authorized
representatie acting for the purpose of this contract
as agent for said owner, shall and will provide all
material and perform all work mentioned in
the specifications or shown on the drawings as prepared
by said architect, or the completion of a Normal School
building at the Ohio University at Athens Ohio.
These drawings and specifications are identified by the
file in the Office of the Auditor of State.
Art-2:- The Architect shall furnish the
Contractor such further drawings or explanations as may
be necessary to detail and illustrate the work to
be done, and the contractor shall conform to the
same as a part of the contract so far as they may
be consistent with the original drawings and
specifications referred to and identified as provided
in Article-1- - It is mutually understood and
agreed that all drawings and specifications are
and remain the property of the State.
Art-3-. No alterations shall be made
in the work shown or described by the drawings
and specifications , except upon the written order of
the Architect ,and the amount so as certained shall
be added or deducted from the contract price.
Art-4- The contractor shall provide
sufficient, safe and proper facilities at all times for
the inspection of the work by the Architect or his
authorized representative. He shall, within twenty foru
hours after receiving written notice from the
Architect to that effect remove from the grounds and
buildings , all material condemned by him whether
worked or unworked , and to take down all portion
of the work which the Architect shall by like written
notice condemn as unsound,improper or as
in any way failing to conform to the drawings
and specifications.
Art-5. Should the contractor at any
time refuse or neglect to supply a . Sufficiency of

Notes and Questions

Nobody has written a note for this page yet

Please sign in to write a note for this page